Skip to content
For the complete documentation index, see llms.txt. This page is also available as Markdown.

Verification and Correction (Proposal)

Proposal: one verification model and one correction model for both entity registers and activity registers, the API changes that follow, and the decisions taken so far.

A registry can hold two kinds of register: entity registers, whose records are maintained over time (a person, a plot, an animal), and activity registers, whose records are occurrences (a visit, a sowing, a vaccination). How they differ is in Activity register.

Today each kind has its own way to verify and to correct a record. This proposal gives both kinds:

  • one trust layer (verification);

  • one correction model, with disputes;

  • the API changes that follow.

Already built (not part of this proposal): typed participants per activity, entities first, partner corrections of activities, a context that names the context it replaces, and verification status in an activity register's DCI output. See Activity register and its design.

The registry's job is that its records are authentic, and verified where that is needed. Whether a programme acts on a record (approval for payment or eligibility) is decided outside the registry, in the programme system (PBMS).

Terms

Term
What it means
What happens to the data

Validation

Automatic checks at entry: format, required fields, reference data, plausibility

Bad input is rejected or warned on; nothing is stored about it

Change

The world changed: the person moved, sold a plot

A new version; the old value stays in history as true at that time. An activity never changes: a new event is a new activity

Correction

The record was wrong: a typo, a mis-measured area

A new version; the old value is marked as an error, never true

Void

The record shouldn't exist: a duplicate, an event that never happened

Kept, but no longer counts

Approval (of a change)

A supervisor authorises a change or correction before it enters the register

Governs who may change data; says nothing about whether it is true

Verification (attestation)

An independent check that the data matches reality or an authoritative source: a field visit, a document, a trusted device

Never changes the data. Adds a trust status, with who checked, how and with what evidence. A failed verification leads to a correction or a void

Dispute

The person concerned says a record is wrong

Triggers verification, then a correction if the claim holds

Today

Entity register
Activity register

Verification

Rows in g2p_register_verifications, each tied to a change request or an intake submission (/verifications/get_verifications, add_verification)

Columns on the activity: verification_status (NOT_REQUIRED, SUBMITTED, VERIFIED, REJECTED), verified_by, verified_at, verification_remarks. Switched on per activity type (requires_verification); verify_activity and reject_activity

Approval of changes

AWE, on change requests and intake submissions

None: appends and corrections are governed by permissions (activity:create, activity:correct) and rules

Corrections

A change request: a new version, the old one kept in history. Nothing marks it as a correction rather than a change

Supersede or void, with a reason

Disputes

None

None

Certificates

Verifiable credentials from the agent portal (VC issuance)

None

Trust layer: verification

Verification policy

Set in configuration. What needs verifying depends on the registry, so the target is chosen per case:

  • a field (for example the national ID, checked against the ID system);

  • a section (for example land tenure, from a document);

  • the whole record;

  • an activity type (for example Sown, as the Crop Sown Registry does today).

For each target, the policy says:

  • whether verification is required;

  • which methods count: manual (a supervisor or field officer), document, a system check against an authoritative source, or a trusted source whose authenticated submissions count as verified (a vet's system, a biometric device);

  • who may verify (roles);

  • what evidence is expected (a photo, a document, a device capture).

Verification records

A verification record is attached to a target. It holds:

  • outcome (verified or failed) and method;

  • actor (a person, a system or a trusted source);

  • evidence references;

  • remarks, and when.

A target can have several: a verification, a dispute, a re-verification. The log is kept.

Verification status

Derived from the records. It is what the staff portal shows, and what the APIs filter on and share:

Status
Meaning

NOT_REQUIRED

The policy does not ask for verification

PENDING

Required, not yet done (today's SUBMITTED on activities)

VERIFIED

The latest outcome is verified

FAILED

The latest outcome is failed (today's REJECTED on activities)

DISPUTED

A dispute is open

A change or correction to a verified target sets it back to PENDING: new data hasn't been checked.

Verification by an activity

A field check is itself something that happened, so it can be recorded as an activity: a site visit with a photo, a GPS point and a short form, whose participant is the record being checked (a sowing, a plot, a person). The verification activity type declares what it verifies, and its outcome creates the verification record, with the activity as its evidence.

This gives a verification a date, a place and evidence, ODK and agent capture, and a work list of visits due. The status still sits on the target, because other methods (an ID lookup, a trusted device) set it too. The visit is the evidence; the status is the result.

Mapping from today

  • g2p_register_verifications and the verification columns on activities both become verification records.

  • AWE approval of change requests stays as it is. It governs who may change data, not whether the data is true.

  • Certificates stay outside the model. They are verifiable credentials, issued by the existing VC issuance feature, not a trust step.

  • The default policy reproduces today's behaviour: activity verification only where requires_verification is set, entity verification as now. Existing registries need no change.

One correction model

A correction fixes data that was wrong, always with a reason. A change records that the world changed. How each lands depends on the kind:

Situation
Entity register
Activity register

A value was wrong

Change request marked as a correction, with a reason → new version; history keeps the old one, marked as an error

A correcting activity supersedes the old one, which stays (built)

It shouldn't exist

Deactivate

Void: it didn't happen; it stays (built)

Who may

Change requests go through AWE, as today

The activity:correct permission, as today

Disputed (the person concerned says it's wrong)

A dispute recorded against the target; resolved by verification, then a correction if the claim holds

Same

Verification after

The changed fields go back to PENDING

The correcting activity starts PENDING if its type requires verification

A resurvey. An agent re-measures a plot and gets a different value. It is either a correction (the first measure was wrong) or a new observation (things changed). The form asks which. For an activity, a correction supersedes and a new observation is a new activity; for an entity, both are change requests, and only the correction is marked as one.

A failed verification leads to a correction or a void. It never edits the data itself.

Shared capabilities for entity registers

Some capabilities built for activity registers would serve entity registers too:

Capability
Activity register today
Proposed for entity registers

Reference rules (Master Data list, geography, local record, external ID; strict or lenient)

Built

On entity sections, beyond widget-bound lists

Location as named levels (geo_dimensions)

Built

On entity records too, for area statistics (today they have geo_code_hierarchy_json)

Idempotent ingestion

Built (idempotency key per activity)

Idempotency keys on entity ingestion

Derived values

A context's current state, aggregates, indicators

For example a person's total land area, a household's size

One form definition

Generated from the type's JSON Schema, with section_ui_schema layout

One form definition for both kinds; only what happens on submit differs (a change request or an append)

Participants with roles

Built

For relations beyond a parent (a member's cooperative, a worker's employer). Not yet needed

API changes

All of these are additive: existing endpoints keep working.

Staff API

Area
Change

Verification (new, common)

/verification/*: get the policy for a register, section, field or activity type; add a verification record (verified, failed, dispute) on any target, with evidence; list a target's records and status; list items awaiting verification (a work queue). /verifications/*, verify_activity and reject_activity remain as shortcuts onto it

Corrections

Entity change requests can be marked as corrections, with a reason (approved in AWE as today). supersede_activity and void_activity stay. Both reset the verification of what they touch

Entity registers

Named-level locations on records; reference rules on sections; idempotency keys on ingestion

Partner API

Area
Change

Trusted sources

Partner Management marks a partner as a trusted source for given activity types or fields. Its signed submissions record an automatic verification, with the signature as evidence

Verification status in responses

Every record type carries its status, filtered by consent like any other field. Searches can require a status, for example only verified records. (Today an activity register's output templates can include it, as the Crop Sown Registry's do; entity records don't carry it)

Subscribe / notify

Subscribe to activity events (appended, superseded, voided, verified), published from the existing outbox, so a programme hears when a record is verified or corrected

Beneficiary API

Area
Change

Own activities

A person's own activities, contexts and summaries

Disputes

Dispute a record or activity about oneself, for staff to resolve by verification and, if the claim holds, a correction

Phase 2

The built pieces listed above were phase 1. Phase 2 is this proposal:

  1. Verification model, common to both kinds: policies per field, section, record or activity type; verification records with evidence; derived status; automatic verification from trusted sources; status on every record type in partner responses.

  2. Corrections and disputes: corrections marked as such on change requests; disputes; a change or correction resets verification.

  3. Shared capabilities on entity registers: named-level locations, reference rules, idempotent ingestion.

  4. Beneficiary API for activities (it needs beneficiary authentication on the registry first), and subscribe / notify for activity events.

Decisions

Question
Decision

Programme approval and certificates in the trust layer?

No. The registry keeps records authentic and verified; whether a programme acts on them is decided in PBMS. VC issuance stays as it is, outside the verification model

Approval vs verification

Separate. Approval (AWE) is about authority to change data; verification is about whether it is true. Both can apply to the same data

What is verified

Configurable per case: a field, a section, the whole record or an activity type. Each target says whether it is required, which methods count, who verifies and what evidence

Verification vocabulary

NOT_REQUIRED, PENDING, VERIFIED, FAILED, DISPUTED. The activity lifecycle stays as built (ACTIVE, SUPERSEDED, VOIDED)

Does verification change data?

Never. It adds a status; a failed check leads to a correction or a void

Open questions

  • When a record a credential was issued from is changed or corrected, should the credential be suspended or revoked? Today it is not.

  • Does a rejected (FAILED) activity keep dropping out of the current state, as today, under the common model?

Last updated

Was this helpful?